System Mechanical & Safety Solutions

Seattle, WA 98108

Company Info

  • Est. 1962
  • Size 20-49 Employees
  • Annual Vol $500,000 - $1 million

Featured Project Return to Projects List

Boeing 3-800 Building

Project Information

Project Location:
Auburn, WA
Approx Contract:
$1,000,000
Status:
Completed - Dec 2012
Structure Type:
Office Building

References

Owner:
Not Provided
Architect:
Not Provided
General Contractor:
System Inc.
Client:
Provided on Request Boeing

Scope Of Work

Upgrade (5) 25 year old 100-50 HP variable pitch Wood Varofoil vane-axial fans to fixed pitch variable frequency drive control.  Project included:

•Replacement of 54,000 CFM hot deck and 148,000 CFM cold deck coil banks

•New stainless steel drain pans, isolation and balance valves, drains and vents

•Upgrade pneumatic control valves to DDC

•Temporary mechanical partitioning to minimize interruption of building usage

•Engineered systems to facilitate access though building envelope

•Motor and fan assembly testing and refurbishment including windings, stators, housings, penetrant testing and coatings. Functional testing and re-commissioning

Not Provided

Share URL copied!
https://www.thebluebook.com/iProView/7201/system-mechanical-safety-solutions/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.