Logo

PHI Construction, Inc.

Portland, OR 97206

4.4

Company Info

  • Est. 1987
  • Size 5-9 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Tualatin Valley Waste Recovery Facility

Project Information

Project Location:
Tualatin Valley, OR
Status:
Completed
Structure Type:
Sewage / Water Treatment Plant

Scope Of Work

The building is a reverse tapered column 186′ clear span rigid frame including one bay with clear spans of 196′. The building has a lean-to canopy that runs 380 linear feet along one sidewall and wraps 30′ around to the buildings endwall.

The three-story office structure abuts the main facility and extends into the main building at the third floor with an observation deck. The office roof is a Standing Seam 360 system and the wall system is an Architectural III panel. The main building’s roof is a “Resolite 18 oz. Tread Safe” translucent panel. The main building utilizes 29 ga. liner panel as well as Resolite 7 oz translucent panels full height.

Project Images

#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/436025/phi-construction-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.