Logo

Loeffler Construction & Consulting

Share

Lakeville, MN 55044

Company Info

  • Est. 2010
  • Size 20-49 Employees
  • Annual Vol $20 million - $50 million

Featured Project Return to Projects List

UMN Territorial Hall Sanitary Sewer Replacement

Project Information

Project Location:
MN
Status:
Completed
Structure Type:
Sewage / Water Treatment Plant

References

Owner:
University of Minnesota
Architect:
TKDA
General Contractor:
Loeffler Construction & Consulting

Scope Of Work

This project targeted the aged and failing sanitary and sewer system located at Territorial Hall. The existing system was removed and rerouted into an adjacent city right of way.

Using contractor preferred means and methods, Loeffler developed a trenchless excavation method that offered the least disruptive approach to adjacent pedestrian parking and vehicular roadways. Through creative pre-planning and coordination with directional drilling equipment, an existing patio was able to be saved, offering the project alternative funds to address other high priority items in the area such as the parking lot and utility upgrades.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/421374/loeffler-construction-consulting/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.