Logo

DMI Drilling Construction

Sumner, WA 98390

Company Info

  • Est. 1991
  • Size 50-99 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

DMI Drilling Construction was incorporated in Washington State in October of 1991. We are responsible, well-qualified, and experienced in most methods of drilling construction. We stand above the competition by offering you personalized service. Our proficient personnel and fleet of versatile equipment make us innovative leaders in all areas of drilling operations. We recognize that in order for you to be successful, you must put your best team in the field. We would like the opportunity to be a part of that team.

While our office and 9.5 acre yard are located in Sumner, WA., we have worked in all states west of Colorado, with the exception of California. We presently own and operate more drilling equipment than any contractor based in the northwest; twenty-two drill rigs, performing a wide variety of drilling related construction.  In addition to our fully equipped mechanical and fabrication shop, we have a large range of support equipment, including excavators, cranes, dump trucks, backhoes, lifts, semi-trucks, trailers, etc.

[Retaining walls] We maintain an inventory of steel casing, timber lagging, and other construction products in order to react timely to emergency situations.

Our Founder, Donald Morin, has been in the drilling business since 1955; our Owner/President, David Morin, since 1978; and our Vice President of Operations, Ed Chappelle, since 1987.  All of our operators/superintendents have 10 to 30+ years experience in the business. Resumes are available for all parties upon request.

We work closely with both geotechnical and structural engineers to help provide an accurate and realistic bid, based upon your design. We can also provide free site visits and analysis of your project requirements.

We are interested in all forms of drilling related construction, including but not limited to: excavation support systems, Soldier Beam retaining walls, landslide stabilization, shotcrete retaining walls, soil nail walls, secant walls, elevator jackshafts, underpinning and deep foundations for towers, transmission line foundations, pole structures and caissons. We specialize in difficult access situations and have the equipment and experience to drill almost any shaft. Recently we completed a project including a drilled shaft at 20 foot diameter x 80 foot deep!

We offer a rental service if it is determined to be in your best interest.

Should you wish to expand our scope of work, we have an experienced team capable of meeting the task. For example: concrete slabs, precast concrete panels, grade beams, walls, excavation, roads, etc. While we do not actively seek this work to avoid being in competition with your needs, we do offer this service if requested.

It is our goal at DMI to construct your project as described in our proposal and for the price you have been quoted.

What We Do

Commercial Experience

Regions & Counties Serviced

  • Seattle

Idaho All

Oregon All

Washington All

Our CSI Codes

01 73 23 - Bracing and Anchoring
02 70 00.00.01 - Water Remediation
03 06 30.23 - Concrete Shaft Schedule
31 06 60.16 - Caisson Schedule
31 23 19 - Dewatering
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 52 13 - Sheet Piling Cofferdams
31 52 16 - Timber Cofferdams
31 52 19 - Precast Concrete Cofferdams
31 63 26 - Drilled Caissons
31 63 26.13 - Fixed End Caisson Piles
31 63 26.16 - Concrete Caissons for Marine Construction
31 63 29 - Drilled Concrete Piers and Shafts
31 63 29.13 - Uncased Drilled Concrete Piers
31 63 33 - Drilled Micropiles
31 64 13 - Box Caissons
31 64 16 - Excavated Caissons
31 64 19 - Floating Caissons
31 64 23 - Open Caissons
31 64 26 - Pneumatic Caissons
31 64 29 - Sheeted Caissons
31 72 13 - Rock Reinforcement and Initial Support
32 11 33 - Cement-Treated Base Courses
32 32 34 - Reinforced Soil Retaining Walls
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 35 - Slope Protection Bank Protection
35 43 35 - Slope Protection Scour Protection
35 53 43 - Underwater Foundation Construction
41 33 23 - Drilling Equipment
41 66 13 - Mobile Boring and Drilling Rigs
43 22 43 - Liquid Filters
43 22 43.13 - Cyclonic Liquid Filters
45 11 01 - Operation and Maintenance of Oil and Gas Extraction Equipment
45 11 06 - Schedules for Oil and Gas Extraction Equipment

Project Experience

  • Union
  • Public
  • Private

Gallery

Featured Image 1
General
Featured Image 2
General
Featured Image 3
Use of two tieback machines on single jobsite
Featured Image 4
Drilling & Excavation

Associations & Memberships

ADSC (The International Assn. of Foundation Drilling)
ADSC (The International Assn. of Foundation Drilling)
Share URL copied!
https://www.thebluebook.com/iProView/417942/dmi-drilling-construction/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.