University of Arizona Science and Technology Park Building 9070 Solar

Project Information

Project Location:
Tucson, AZ
Approx Contract:
$100,000
Status:
Completed - May 2013
Structure Type:
Renewable Energy

References

Owner:
University of Arizona
Architect:
Cogenra
General Contractor:
W.E. O'Neil
Client:
Diane Withee - Project Manager
(520) 792-0734
W.E. O'Neil

Scope Of Work

-Tie in at the existing boiler, bypass line/ valves, hangers and supports, Insulation and aluminum jacketing for all new piping and insulation required for solar panels.

-The installation of all “Cogenra” supplied devices in the piping system (backflow preventer, pumps, gages, expansion tank, air separator, relief valves, make up water assembly, flow meter).

-Furnishing and installing the new roof drain connected to existing 3rd floor drain.

-Demolition of existing piping and removal from the site as shown is included.

-Core drilling for (8) penetrations for our piping.

-Crane charges (including CERTIFIED rigger per site requirements) to remove existing piping and hoist our new piping on roof.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/413049/advantage-air-mechanical/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.