BAR Constructors, Inc.

Share

Lancaster, TX 75146

Company Info

  • Est. 1979
  • Size 100-249 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Joint Cedar Creek Pump Station And Intake Package 1

Project Information

Project Location:
TX
Approx Contract:
$20,000,000
Status:
Completed - Aug 2018
Structure Type:
Misc Project

References

Owner:
Tarrant Regional Water District

Scope Of Work

This project consisted of the excavation, concrete structure, and dredging for the submerged intake portion of the Joint Cedar Creek Pump Station.  Due to the proximity to the lake and the sandy soil, a soil bentonite slurry trench was installed around the entire structure to block the flow of groundwater into the excavation.  A beam and wood lagging shoring system was used to allow portions of the excavation to be vertical.    The intake structure required 200,000 CY of excavation, 50,000 CY of which was performed from barges in the lake.  The structure also required 12,000 CY of concrete, all of which was produced by BAR’s on-site batch plant.   

Project Images

#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/411979/bar-constructors-inc/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.