Logo

Velocity Constructors, Inc.

Share

Englewood, CO 80110

Company Info

  • Est. 2002
  • Size 20-49 Employees
  • Annual Vol $10 million - $20 million

Featured Project Return to Projects List

Hudson Wastewater Treatment Plant Task 3 & 4

Project Information

Project Location:
CO
Approx Contract:
$4,000,000
Status:
Completed - Jan 2010
Structure Type:
Sewage / Water Treatment Plant

References

Owner:
Town of Hudson

Scope Of Work

Engineer: Industrial Facilities

Engineering – Tim Hollbrook (720) 963-4060

Description: The Hudson WWTP was a two phase project. Phase 3 consisted of 24ft deep open excavation with soils stabilization for the new treatment building and the new headwork’s building. Dewatering for the headwork’s building, yard piping to the headworks and around the treatment building. Form and pour tank footings, foundations, sumps 24ft tall walls, influent channels, upper slabs, walkways and installation of reinforced steel to accommodate a new 12,325 sq ft treatment building. Phase 4 consisted of installation of 12,325 sq ft pre-engineered metal building with concrete block walls, interior metal stud walls with gypsum board for new bathrooms, control room, blower room, offices and chemical room. Installation of owner furnished sequencing batch reactor equipment, pumps, blowers, and bar screen. Supply and install process piping, chemical feed equipment, UV system, HVAC, Plumbing and electrical and controls.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/411968/velocity-constructors-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.