Logo

Herzog Contracting Corp.

Long Beach, CA 90806

Company Info

  • Est. 1969
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

SMART IOS-1 & IOS-1A Design-Build

Project Information

Project Location:
Petaluma, CA
Approx Contract:
$200,000,000
Status:
In-Progress
Structure Type:
Misc Project

References

Owner:
SMART

Scope Of Work

SMART IOS-1 & IOS-1A DESIGN-BUILD

This is a design-build project to construct 36 miles of track for the initial operating segment of the new SMART commuter rail system. As a part of the equity joint venture, our work includes removal and reconstruction of track and track bed along an existing alignment, of which 30 miles are under active freight traffic. Notable features of the work include bridge construction (nine replacements and nine repairs), grade crossings (48 public, 18 private), extensive drainage work (over 100 transverse culverts), and station substructures (eight each). The right-of-way goes through numerous environmentally sensitive areas with a large portion of work immediately adjacent to wetlands.

Location: Petaluma, California

Owner: SMART

Cost: $195 million

Completion: Under Construction

System Type: Commuter Rail

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/403460/herzog-contracting-corp/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.