01 00 00 - General Requirements
01 31 00 - Project Management and Coordination
01 31 23 - Project Web Site
01 45 00 - Quality Control
01 45 26 - Plant Inspection Procedures
01 61 00 - Common Product Requirements
01 61 13 - Software Licensing Requirements
01 71 00 - Examination and Preparation
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00 - Performance Requirements
01 80 00.00.01 - Performance Requirements
01 82 00 - Facility Substructure Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 00 - Facility Shell Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 00 - Interiors Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 00 - Facility Services Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 00 - Other Facility Construction Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 00 - Commissioning
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 00 00 - Existing Conditions
02 06 00 - Schedules for Existing Conditions
02 06 30 - Schedules for Subsurface Investigations
02 08 00 - Commissioning of Existing Conditions
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 00 - Existing Conditions Assessment
02 22 19 - Traffic Assessment
02 25 00 - Existing Material Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 00 - Geophysical Investigations
02 31 29 - Magnetotelluric Investigations
02 32 00 - Geotechnical Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 00 00 - Metals
05 08 00 - Commissioning of Metals
05 08 00.00.01 - Commissioning of Metals
06 00 00 - Wood, Plastics, & Composites
06 08 00 - Commissioning of Wood, Plastics, and Composites
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 00 00 - Specialties
10 08 00 - Commissioning of Specialties
10 08 00.00.01 - Commissioning of Specialties
11 00 00 - Equipment
11 08 00 - Commissioning of Equipment
11 08 00.00.01 - Commissioning of Equipment
11 28 00 - Office Equipment
11 28 13 - Computers
11 28 16 - Printers
13 00 00 - Special Construction
13 08 00 - Commissioning of Special Construction
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 00 00 - Fire Suppression
21 08 00 - Commissioning of Fire Suppression
21 08 00.00.01 - Commissioning of Fire Suppression
22 00 00 - Plumbing
22 01 00 - Operation and Maintenance of Plumbing
22 01 10 - Operation and Maintenance of Plumbing Piping and Pumps
22 01 30 - Operation and Maintenance of Plumbing Equipment
22 01 40 - Operation and Maintenance of Plumbing Fixtures
22 01 60 - Operation and Maintenance of Laboratory and Healthcare Systems
22 06 00 - Schedules for Plumbing
22 06 10 - Schedules for Plumbing Piping and Pumps
22 06 10.13 - Plumbing Pump Schedule
22 06 30.13 - Domestic Water Heater Schedule
22 06 60 - Schedules for Laboratory and Healthcare Systems
22 08 00 - Commissioning of Plumbing
22 08 00.00.01 - Commissioning of Plumbing
22 10 00 - Plumbing Piping and Pumps
22 10 00.00.01 - Plumbing Piping and Pumps
22 11 00 - Facility Water Distribution
22 11 13 - Facility Water Distribution Piping
22 13 00 - Facility Sanitary Sewerage
22 13 19.13 - Sanitary Drains
22 15 00 - General Service Compressed-Air Systems
22 15 13 - General Service Compressed-Air Piping
22 60 00 - Gas and Vacuum Systems for Laboratory and Healthcare Facilities
22 60 00.00.01 - Gas and Vacuum Systems for Laboratory and Healthcare Facilities
22 61 00 - Compressed-Air Systems for Laboratory and Healthcare Facilities
22 61 13 - Compressed-Air Piping for Laboratory and Healthcare Facilities
22 61 13.53 - Laboratory Compressed-Air Piping
22 61 13.70 - Healthcare Compressed-Air Piping
22 61 13.74 - Dental Compressed-Air Piping
22 61 19.70 - Healthcare Compressed-Air Equipment
22 62 00 - Vacuum Systems for Laboratory and Healthcare Facilities
22 62 13 - Vacuum Piping for Laboratory and Healthcare Facilities
22 62 13.53 - Laboratory Vacuum Piping
22 62 13.70 - Healthcare, Surgical Vacuum Piping
22 62 13.74 - Dental Vacuum Piping
22 62 23 - Waste Anesthesia-Gas Piping
22 63 00 - Gas Systems for Laboratory and Healthcare Facilities
22 63 13 - Gas Piping for Laboratory and Healthcare Facilities
22 63 13.53 - Laboratory Gas Piping
22 63 13.70 - Healthcare Gas Piping
22 66 00 - Chemical-Waste Systems for Laboratory and Healthcare Facilities
22 66 53 - Laboratory Chemical-Waste and Vent Piping
22 66 70 - Healthcare Chemical-Waste and Vent Piping
22 66 83 - Chemical-Waste Tanks
22 67 00 - Processed Water Systems for Laboratory and Healthcare Facilities
22 67 13 - Processed Water Piping for Laboratory and Healthcare Facilities
22 67 13.13 - Distilled-Water Piping
23 00 00 - Heating, Ventilating, & Air Conditioning
23 01 00 - Operation and Maintenance of HVAC Systems
23 01 20 - Operation and Maintenance of HVAC Piping and Pumps
23 01 50 - Operation and Maintenance of Central Heating Equipment
23 01 80 - Operation and Maintenance of Decentralized HVAC Equipment
23 06 00 - Schedules for HVAC
23 06 10 - Schedules for Facility Fuel Service Systems
23 06 20 - Schedules for HVAC Piping and Pumps
23 06 50 - Schedules for Central Heating Equipment
23 06 50.13 - Heating Boiler Schedule
23 06 80.16 - Convection Heating and Cooling Unit Schedule
23 08 00 - Commissioning of HVAC
23 08 00.00.01 - Commissioning of HVAC
23 10 00 - Facility Fuel Systems
23 10 00.00.01 - Facility Fuel Systems
23 11 00 - Facility Fuel Piping
23 11 13 - Facility Fuel-Oil Piping
23 11 23 - Facility Natural-Gas Piping
23 20 00 - HVAC Piping and Pumps
23 20 00.00.01 - HVAC Piping and Pumps
23 21 00 - Hydronic Piping and Pumps
23 21 13.23 - Aboveground Hydronic Piping
23 22 00 - Steam and Condensate Piping and Pumps
23 22 13 - Steam and Condensate Heating Piping
23 22 13.13 - Underground Steam and Condensate Heating Piping
23 22 13.23 - Aboveground Steam and Condensate Heating Piping
23 24 00 - Internal-Combustion Engine Piping
23 24 16 - Internal-Combustion Engine Exhaust Piping
25 00 00 - Integrated Automation
25 08 00 - Commissioning of Integrated Automation
25 08 00.00.01 - Commissioning of Integrated Automation
25 11 00 - Integrated Automation Network Devices
25 11 13 - Integrated Automation Network Servers
25 11 16 - Integrated Automation Network Routers, Bridges, Switches, Hubs, and Modems
25 11 19 - Integrated Automation Network Operator Workstations
25 12 00 - Integrated Automation Network Gateways
25 12 13 - Hardwired Integration Network Gateways
25 12 16 - Direct-Protocol Integration Network Gateways
25 12 19 - Neutral-Protocol Integration Network Gateways
25 12 23 - Client-Server Information/Database Integration Network Gateways
25 13 00 - Integrated Automation Control and Monitoring Network
25 13 13 - Integrated Automation Control and Monitoring Network Supervisory Control
25 13 16 - Integrated Automation Control and Monitoring Network Integration Panels
25 13 19 - Integrated Automation Control and Monitoring Network Interoperability
25 15 00 - Integrated Automation Software
25 15 13 - Integrated Automation Software for Network Gateways
25 15 16 - Integrated Automation Software for Control and Monitoring Networks
25 15 19 - Integrated Automation Software for Local Control Units
26 00 00 - Electrical
26 05 00 - Common Work Results for Electrical
26 05 43 - Underground Ducts and Raceways for Electrical Systems
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00 - Commissioning of Electrical Systems
26 08 00.00.01 - Commissioning of Electrical Systems
27 00 00 - Communications
27 08 00 - Commissioning of Communications
27 08 00.00.01 - Commissioning of Communications
27 20 00 - Data Communications
27 20 00.00.01 - Data Communications
27 21 00 - Data Communications Network Equipment
27 21 16 - Data Communications Routers, CSU/DSU, Multiplexers, Codec’s, and Modems
27 21 26 - Data Communications Network Management
27 22 00 - Data Communications Hardware
27 22 13 - Data Communications Mainframes
27 22 16 - Data Communications Storage and Backup
27 22 19 - Data Communications Servers
27 22 23 - Data Communications Desktops
27 22 26 - Data Communications Laptops
27 24 00 - Data Communications Peripheral Data Equipment
27 24 16 - Scanners
27 24 19 - External Drives
27 24 26 - Virtual Reality Equipment
27 25 00 - Data Communications Software
27 25 13 - Virus Protection Software
27 25 16 - Application Suites
27 25 19 - Email Software
27 25 23 - Graphics/Multimedia Software
27 25 26 - Customer Relationship Management Software
27 25 29 - Operating System Software
27 25 33 - Database Software
27 25 37 - Virtual Private Network Software
27 25 39 - Internet Conferencing Software
27 26 00 - Data Communications Programming and Integration Services
27 26 13 - Web Development
27 26 16 - Database Development
27 26 19 - Application Development
27 26 23 - Network Integration Requirements
27 26 26 - Data Communications Integration Requirements
27 32 00 - Voice Communications Telephone Sets, Facsimiles and Modems
27 32 29 - Facsimiles and Modems
27 34 00 - Call Accounting
27 34 13 - Toll Fraud Equipment and Software
27 34 16 - Telemanagement Software
28 00 00 - Electronic Safety & Security
28 08 00 - Commissioning of Electronic Safety and Security
28 08 00.00.01 - Commissioning of Electronic Safety and Security
31 00 00 - Earthwork
31 08 00 - Commissioning of Earthwork
31 08 00.00.01 - Commissioning of Earthwork
31 09 00 - Geotechnical Instrumentation and Monitoring of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
31 21 00 - Off-Gassing Mitigation
31 21 16.13 - Methane Venting
32 00 00 - Exterior Improvements
32 08 00 - Commissioning of Exterior Improvements
32 08 00.00.01 - Commissioning of Exterior Improvements
33 00 00 - Utilities
33 01 00 - Operation and Maintenance of Utilities
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 00 - Schedules for Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 08 00 - Commissioning of Utilities
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 09 00 - Instrumentation and Control for Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 00 - Water Utility Distribution Piping
33 11 16 - Site Water Utility Distribution Piping
33 29 00 - Well Abandonment
33 29 00.00.01 - Well Abandonment
33 33 00 - Low Pressure Utility Sewerage
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 00 - Sanitary Utility Sewerage Force Mains
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 00 - Storm Utility Drainage Piping
33 41 13 - Public Storm Utility Drainage Piping
33 50 00 - Fuel Distribution Utilities
33 50 00.00.01 - Fuel Distribution Utilities
33 51 00 - Natural-Gas Distribution
33 51 13 - Natural-Gas Piping
33 60 00 - Hydronic and Steam Energy Utilities
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 00 - Hydronic Energy Distribution
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 00 - Steam Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00 - Electrical Utilities
33 70 00.00.01 - Electrical Utilities
33 71 00 - Electrical Utility Transmission and Distribution
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 00 - Site Grounding
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 00 00 - Transportation
34 08 00 - Commissioning of Transportation
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
34 42 00 - Railway Signaling and Control Equipment
34 42 19 - Vital Interlocking Logic Controllers
35 00 00 - Waterway & Marine Construction
35 08 00 - Commissioning of Waterway and Marine Construction
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 00 00 - Process Integration
40 01 00 - Operation and Maintenance of Process Integration
40 01 10 - Operation and Maintenance of Gas and Vapor Process Piping
40 01 20 - Operation and Maintenance of Liquids Process Piping
40 01 40 - Operation and Maintenance of Process Piping and Equipment Protection
40 05 00 - Common Work Results for Process Integration
40 05 13 - Common Work Results for Process Piping
40 05 13.13 - Steel Process Piping
40 05 13.16 - Lined or Internally-Coated Steel Process Piping
40 05 13.19 - Stainless-Steel Process Piping
40 05 13.23 - Aluminum Alloys Process Piping
40 05 13.33 - Brass, Bronze, Copper, and Copper Alloys Process Piping
40 05 13.43 - Nickel and Nickel Alloys Process Piping
40 05 13.53 - Ductile, Malleable, and Cast Iron Alloys Process Piping
40 05 13.63 - Titanium and Titanium Alloys Process Piping
40 05 13.73 - Plastic Process Piping
40 05 13.76 - Fiberglass-Reinforced Plastic and Resins Process Piping
40 05 13.93 - Other Metals Process Piping
40 06 00 - Schedules for Process Integration
40 06 10 - Schedules for Gas and Vapor Process Piping
40 06 20 - Schedules for Liquids Process Piping
40 06 30 - Schedules for Solid and Mixed Materials Piping and Chutes
40 06 40 - Schedules for Process Piping and Equipment Protection
40 10 00 - Gas and Vapor Process Piping
40 10 00.00.01 - Gas and Vapor Process Piping
40 11 00 - Steam Process Piping
40 11 13 - Low-Pressure Steam Process Piping
40 11 16 - Intermediate-Pressure Steam Process Piping
40 11 19 - High-Pressure Steam Process Piping
40 11 23 - Condensate Process Piping
40 12 00 - Compressed Air Process Piping
40 12 13 - Breathing Compressed Air Process Piping
40 12 16 - Non-Breathing Compressed Air Process Piping
40 13 00 - Inert Gases Process Piping
40 13 13 - Argon Process Piping
40 13 16 - Carbon-Dioxide Process Piping
40 13 19 - Helium Process Piping
40 13 23 - Krypton Process Piping
40 13 26 - Neon Process Piping
40 13 29 - Nitrogen Process Piping
40 13 33 - Xenon Process Piping
40 13 93 - Mixed Inert Gases Process Piping
40 14 00 - Fuel Gases Process Piping
40 14 16 - Blue (Water) Fuel Gas Piping
40 14 19 - Butane Piping
40 14 23 - Carbon-Monoxide Piping
40 14 26 - Chlorine Fuel Gas Piping
40 14 33 - Ethane-Gas Piping
40 14 36 - Hydrogen Fuel Gas Piping
40 14 39 - Liquid Natural-Gas Process Piping
40 14 43 - Methylacetylene-Propadiene Fuel Gas Piping
40 14 49 - Natural-Gas Process Piping
40 14 49.13 - Synthetic Natural-Gas Piping
40 14 49.23 - Propane-Air Mixes Fuel Gas Piping
40 14 53 - Octane Fuel Gas Piping
40 14 59 - Propane Fuel Gas Process Piping
40 14 63 - Sewage Fuel Gas Piping
40 14 93 - Mixed Fuel Gases Piping
40 15 00 - Combustion System Gas Piping
40 15 13 - Combustion Air Piping
40 15 16 - Oxygen Combustion System Gas Piping
40 15 23 - Exothermic-Gas Combustion System Piping
40 15 26 - Endothermic-Gas Combustion System Piping
40 15 29 - Disassociated-Ammonia-Gas Combustion System Piping
40 16 00 - Specialty and High-Purity Gases Piping
40 16 13 - Ammonia Gas Piping
40 16 16 - Boron Gas Piping
40 16 26 - Diborane Gas Piping
40 16 29 - Fluorine Gas Piping
40 16 33 - Hydrogen Sulfide Gas Piping
40 16 36 - Nitrous-Oxide Gas Process Piping
40 16 39 - Ozone Gas Piping
40 16 43 - Phosphine Gas Piping
40 16 46 - Silane Gas Piping
40 16 49 - Sulfur-Dioxide Gas Piping
40 16 53 - Specialty Gas Mixtures Piping
40 18 00 - Vacuum Systems Process Piping
40 18 13 - Low-Vacuum Systems Process Piping
40 18 16 - High-Vacuum Systems Process Piping
40 20 00 - Liquids Process Piping
40 20 00.00.01 - Liquids Process Piping
40 21 00 - Liquid Fuel Process Piping
40 21 13 - Bio Fuels Process Piping
40 22 00 - Petroleum Products Piping
40 22 16 - Light-Fractions Petroleum Products Piping
40 23 00 - Water Process Piping
40 23 13 - De-Ionized Water Process Piping
40 23 16 - Distilled-Water Process Piping
40 23 19 - Process Plant Water Piping
40 23 23 - Potable Water Process Piping
40 23 29 - Recirculated Water Process Piping
40 23 33 - Reverse-Osmosis Water Process Piping
40 23 36 - Sanitary Water Process Piping
40 24 00 - Specialty Liquid Chemicals Piping
40 24 13 - Alcohol Piping
40 24 16 - Gel Piping
40 24 19 - Slurries Process Piping
40 24 23 - Thixotropic Liquid Piping
40 25 00 - Liquid Acids and Bases Piping
40 25 13 - Liquid Acids Piping
40 25 16 - Liquid Bases Piping
40 26 00 - Liquid Polymer Piping
40 26 00.00.01 - Liquid Polymer Piping
40 80 00 - Commissioning of Process Systems
40 80 00.00.01 - Commissioning of Process Systems
40 94 00 - Digital Process Controllers
40 94 13 - Digital Process Control Computers
40 94 13.13 - Host Digital Process Control Computers
40 94 13.16 - Personal Digital Process Control Computers
40 94 13.19 - Personal Digital Assistant Digital Process Control Computers
40 95 00 - Process Control Hardware
40 95 33 - Process Control Networks
40 95 43 - Process Control Hardware Interfaces
40 95 49 - Process Control Routers
40 95 53 - Process Control Switches
40 96 00 - Process Control Software
40 96 10 - Process Control Software Architecture
40 96 15 - Process Control Software Input/Output Lists
40 96 20 - Process Control Software Instrument Lists
40 96 25 - Process Control Software Logic Diagrams
40 96 30 - Process Control Software Loop Diagrams
40 96 35 - Process Control Software Programming
40 96 40 - Process Control Software Reports
41 00 00 - Material Processing & Handling Equipment
41 08 00 - Commissioning of Material Processing and Handling Equipment
41 08 30 - Commissioning of Manufacturing Equipment
42 00 00 - Process Heating, Cooling, & Drying Equipment
42 08 00 - Commissioning of Process Heating, Cooling, and Drying Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 00 00 - Process Gas & Liquid Handling, Purification....
43 08 00 - Commissioning of Process Gas and Liquid Handling, Purification, and Storage Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 00 00 - Pollution Control Equipment
44 08 00 - Commissioning of Pollution Control Equipment
44 08 40 - Commissioning Water Treatment Equipment
45 00 00 - Industry-Specific Manufacturing Equipment
45 08 00 - Commissioning of Industry-Specific Manufacturing Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 00 00 - Electrical Power Generation
48 08 00 - Commissioning of Electrical Power Generation
48 08 00.00.01 - Commissioning of Electrical Power Generation