Featured Project Return to Projects List
Asbestos Abatement for a Hospital
Project Information
- Project Location:
- Van Nuys, CA
- Status:
- Completed
- Structure Type:
- School / College / University
Scope Of Work
During the massive yearlong project, ATI performed selective interior demolition and environmental abatement, containment and fire-stopping services. ATI crews removed both nonhazardous and hazardous walls, ceilings and floors throughout the 54,000-square-foot main building; abated hazardous materials in walls, ceilings and floors containing asbestos; and removed surfaces with lead-based paint to support the General Contractor and all sub trades with the seismic improvement in “high-risk” patient care environments.