Featured Project Return to Projects List
Library Stack Renovation – US Court of Military Appeals
Project Information
- Project Location:
- Washington, DC
- Approx Contract:
- $300,000
- Status:
- Completed - Nov 2010
- Structure Type:
- Military
References
- Owner:
- General Services Administration Jerome Cottrell, Architect
Scope Of Work
The General Services Administration contracted CEEPCO to design and renovate the library stack. This design/build project included, but was not limited to, all surveys, contract drawings, specifications, and construction. CEEPCO prepared full A&E design documents to include the main Library entrance door removal and replacement, new technical services offices and kitchenette at the east end of the stack room, new enclosed mail area at the west end of the stack room and painting, furniture and carpet throughout each area. CEEPCO removed existing interior finishes including carpeting, suspended acoustical ceiling system, gypsum board ceilings and portions of a raised floor construction and for installation of new kitchenette and mail area. CEEPCO then installed drywall, glass entry doors, gypsum board partitions, new acoustical ceilings, millwork for cabinetry, and all new appliances for the kitchenette. We provided, relocated, and installed mechanical returns and diffuses to accommodate the new room layout and provided exhaust ventilation for the new kitchenette. The project involved installing new plumbing fixtures for the new kitchenette including sink, faucets and disposals, and installing all plumbing supply and waste piping for the new kitchenette. CEEPCO also tied-in piping into existing adjacent plumbing supply and waste lines. Electrical work included removal and disposal of existing abandoned electrical devices and fixtures and then rewiring for the new layout room configuration. CEEPCO also provided, relocated, and installed fire alarm devices and fire suppression devices for the new room configuration.