Logo

Wagner Engineering & Survey, Inc.

Northridge, CA 91325

Company Info

  • Est. 1989
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Adelanto Southern California Gas Compressor Station

Project Information

Project Location:
Adelanto, CA
Status:
Completed - Jan 2015
Structure Type:
Utilities

References

Owner:
Southern California Gas Company
Architect:
Not Available
Client:
Ali Razavi - Project Manager
(858) 812-0776
URS

Scope Of Work

Wagner Engineering & Survey, Inc. (WES), performed land surveying, aerial mapping and civil engineering services for this project. WES provided 5 aerial control panels and horizontal and vertical control utilizing GPS technology on the road, grading & drainage development survey support. A topographic map at scale 1″ = 20′ with a 1-foot contour interval was produced. Critical design features not picked up on the aerial photos were supplemented with ground surveys. WES produced digital color ortho-rectified photography. Utility analysis was included in the survey with location of water and sewer systems.

Civil Engineering was also performed. WES researched as built documents for existing improvements and utilities. Hydraulic Calculations, Grading and Drainage Design were performed, including Storm Water Management Design and Low Impact Development (LID) in compliance with city regulations. A utility analysis was done to upgrade sewer and water systems to increased capacity hydraulics were calculated and a utility analysis report was delivered. Storm water pollution plans (SWPPP) were produced with Erosion Control Plan (ECP) and Best Management Practices (BMP).

Share URL copied!
https://www.thebluebook.com/iProView/389813/wagner-engineering-survey-inc/engineers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.