Logo

Parker Systems, Inc.

Chesapeake, VA 23323

Company Info

  • Est. 1970
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

James H Parker founded the company in 1970.  Since that time, Parker Systems, Inc. (PSI) quickly became, and continues to be a major supplier of environmental equipment worldwide.

SpillMaster® Permanent boom- designed to stay in the water “at the ready” year round in the harshest of environments.  If a spill happens it is already in place! Designed to fit under piers and survive in an industrial environment. 

SpillMaster® Response boom- Designed to be deployed in the water as soon as a spill has occurred. We have standard products and we can custom build to a customer’s needs.   
 
OilSnare® Viscous Oil Adsorbent products
PSI is the original creator & manufacturer of OilSnare® products, and probably the world’s largest supplier of viscous oil adsorbents to the oil spill clean-up-industry.   
 
SiltMaster® Turbidity Curtains
Turbidity curtains (silt curtain) are designed to hold back silt and/or debris at marine construction sites, dredging bridges and bulkheads.  
 
Fuel Vent Containment Bags®
PSI designed Fuel Vent Bags (FVB)to avoid costly fines, cleanup cost and vessel delays.  FVB easily attaches to your vent housings and adjacent bulkheads to collect and contain fuel that could spill during fueling operations.
 
Sorbents
PSI maintains a full inventory of Oil, Universal, and Industrial Sorbents, Spill Kits and all associated HAZMAT clean up, storage, & transportation accessories,  
 

What We Do

Regions & Counties Serviced

  • Virginia

Maryland All

Virginia All

Our CSI Codes

01 57 13 - Temporary Erosion and Sediment Control
01 66 13 - Product Storage and Handling Requirements for Hazardous Materials
01 66 16 - Product Storage and Handling Requirements for Toxic Materials
02 01 50 - Maintenance of Site Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 06 50 - Schedules for Site Remediation
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 26 36 - Hazardous Waste Drum Assessment
02 50 00.00.01 - Site Remediation
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 55 00.00.01 - Remediation Soil Stabilization
02 56 13 - Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 58 13 - Snow Fencing
02 60 00.00.01 - Contaminated Site Material Removal
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 86 00.00.01 - Hazardous Waste Drum Handling
06 13 33 - Heavy Timber Pier Construction
11 92 23 - Agricultural Waste Clean-Up Equipment
23 01 60.71 - Refrigerant Recovery/Recycling
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
31 63 19.13 - Rock Sockets for Piles
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.23 - Structural Soil Mixing
32 92 13 - Hydro-Mulching
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
33 01 30.52 - Pond and Reservoir Maintenance
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
34 82 19 - Bridge Pier Protection
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 01 50.71 - Channel Excavation, Cleaning and Deepening
35 05 30 - Common Work Results for Coastal Construction
35 05 40 - Common Work Results for Waterway Construction
35 05 50 - Common Work Results for Marine Construction
35 06 30 - Schedules for Coastal Construction
35 06 40 - Schedules for Waterway Construction
35 06 50 - Schedules for Marine Construction
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 20 23 - Dredging
35 20 23.13 - Mechanical Dredging
35 20 23.23 - Hydraulic Dredging
35 20 23.33 - Integrated Dredging and Dewatering
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 31 29.40 - Stone Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection
35 43 37 - Riprap Scour Protection
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 53 23 - Underwater Harbor Deepening
35 59 13 - Marine Fenders
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 71 19 - Rockfill Gravity Dams
35 73 16 - Rock Embankment Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders
43 22 29 - Drum Handling Liquid Process Equipment
43 22 43.16 - Media Liquid Filters
43 30 00.00.01 - Gas and Liquid Purification Equipment
43 31 13 - Gas and Liquid Purification Filters
43 31 13.13 - Activated Carbon-Gas and Liquid Purification Filters
43 31 13.19 - High-Purity Cartridge Gas and Liquid Purification Filters
43 31 13.23 - Membrane Diaphragm Gas and Liquid Purification Filters
43 31 13.26 - Multimedia Gas and Liquid Purification Filters
43 31 13.29 - Pretreatment Cartridge Gas and Liquid Purification Filters
43 32 59 - Gas and Liquid Purification Scrubbers
44 01 40 - Operation and Maintenance of Water Treatment Equipment
44 42 13 - Aeration Water Treatment Equipment
44 42 16 - American Petroleum Institute Separators
44 42 19 - Water Treatment Blowers
44 42 23 - Water Treatment Clarifiers
44 42 29 - Water Treatment Compressors
44 42 33 - Water Treatment Digesters
44 42 36 - Water Treatment Dissolved Air Flotation Equipment
44 42 39 - Water Treatment Grit Collectors
44 42 43 - Water Treatment Induced Air Flotation Equipment
44 42 46 - Water Treatment Mixers
44 42 49 - Water Treatment Oil/Grease Interceptors
44 42 53 - Water Treatment Oil/Water Separators
44 42 56 - Water Treatment Pumps
44 42 63 - Water Treatment Sediment Removal Equipment
44 42 66 - Water Treatment Skimmers
44 42 73 - Water Treatment Tanks/Tank Liners
44 43 13.13 - Bag Water Filters
44 43 13.16 - Cartridge Water Filters
44 43 13.19 - Fabric Water Filters
44 43 13.23 - Multimedia Water Filters
44 43 13.26 - Packaged Water Filters
44 43 23 - Water Filter Presses
44 43 26 - Rotary-Drum Water Filtration Equipment
44 43 33 - Water Filtration Screens
44 43 36 - Vacuum Water Filtration Equipment
44 44 16 - Water Chlorinators
44 44 26 - Dissolved-Solids Water Treatment Equipment
44 44 43 - Water Heavy Metals Treatment Equipment
44 44 59 - Water pH Adjustment Equipment
44 44 63 - Water Polymers Equipment
44 44 66 - Water Precipitators
44 44 73 - Water Ultraviolet Radiation Equipment
44 45 16 - Water Bubble Membrane Diffusers
44 46 13 - Sludge Conveyors

Project Experience

  • Projects Up to $100,000

Gallery

Featured Image 1
Permanent Booms
Featured Image 2
Response Booms
Featured Image 3
SuperFlex Boom Debris Barrier
Featured Image 4
Oil Cleanup Sorbents

Preferred Brands

PSI (Parker Systems Inc.)
PSI (Parker Systems Inc.)
OilSnare
OilSnare
Spillmaster
Spillmaster
Share URL copied!
https://www.thebluebook.com/iProView/386789/parker-systems-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.