MIG Corp.
Acton, MA 01742
Featured Project Return to Projects List
Precast Beam & Deck Erection & Pile Driving on the Replacement of the Central Bridge on Rt. 114
Project Information
- Project Location:
- Barrington, RI
- Approx Contract:
- $5,000,000
- Status:
- Completed
- Structure Type:
- Misc Project
References
- Client:
- Cardi Corp
Scope Of Work
Project Highlights: Furnish and install temporary earth support system and permanenet sheet piling at the toe of riprap slopes.Provide concrete filled steel pipe piles, cutting off piles at specified elevations, and coating the piles at the specified locations. Foundation piles driven to a sufficient depth and resisteance to adequately develop their specified load supporting capacity Test piles driven to a driving resistance determined from a Wave Equation Analysis.