Naperville North High School
Project Information
- Project Location:
- Naperville, IL
- Status:
- Completed
- Structure Type:
- School / College / University
Scope Of Work
The interior demolition project required removal of a large, interior, concrete lap pool that ranged from 4 feet to 12 feet in depth from end to end. Challenging enough, but try removing it with only two double entry doors for access. Break Thru rose to the occasion. Accustomed to unique projects that require attention to details and strategic approach, the interior demolition team brought in smaller scale equipment and completed a big job in only 8 days (2 days earlier than project deadline).
A small excavator with hydraulic hammer was perfect for the small space as it fit through the entry ever so carefully with boom extended and only a half inch to spare. All the concrete was broken up and material was loaded onto trucks using bobcats so that it could be carefully removed from the scene.