Featured Project Return to Projects List
Geotechnical and Construction Materials Testing
Project Information
- Project Location:
- Lake County, IL
- Status:
- Completed
- Structure Type:
- Road / Highway
Scope Of Work
New alignment of Roberts Road with a roundabout intersection with River Road. Geotechnical Phase 1 and 2 studies included borings through wetland areas and existing pavement. SGR includes addressing potential of land bridge or sheet pile supported excavate-refill scheme for embankment support over 30 feet of organic soils. Retaining wall structures are addressed as well for the proposed roundabout location. Construction inspection included observation and documentation of almost 4000 controlled modulus columns and the load transfer platform during construction.