? Exterior
At the leaking area identified during our site
visit above the stairwell and common area we
will:
1)
remove the tile and underlayment down to the substrate along the
entire roof-to-wall
transition (+/- 30LF) at the flashing. (+/-
60 tiles)
2) Inspect the wall flashing, substrate for
deterioration. Replace rotted wood and damaged
metal flashing as
necessary. Repaint and re-stucco if/ where necessary.
3) After
repairs are complete we shall reinstall previously removed tile with
polyfoam
adhesive or tile-tite mortar adhesive. (Note: some tile
may break during the removal
process and we will try to match
the new tile as closely as possible to the old).
5) Clean all
debris created from our work and dispose of in a professional
manner.
6) Add'I Svc.: Replace broken tile at NE corner Building
D, Unit D-9.
? Interior
1) Remove damaged drywall, tape
and cornerbead.
2) Replace drywall, tape, and bead where
required with mesh or paper tape.
3) Repair drywall, mud 2
coats.
4) Sand to match existing finish.
5) Use sealant/
primer at discolored and repaired interior locations areas.
6)
Repaint Repaired areas to match existing.
Repair all deficiencies in roof.
Repair all balconies and railings and paint Buildings A, B C and D.