Featured Project Return to Projects List
Manior Electroalloys
Project Information
- Project Location:
- Elyria, OH
- Status:
- Completed
- Structure Type:
- Manufacturing Plant
Scope Of Work
Construction of a 20000 s.f. clear-span machine shop addition to existing foundry with two foundations for 22 meter horizontal boring mills, and a 3200 s.f. centrifugal mold storage building with storage racks and a 5-ton crane. Both additions were completed simultaneously. The project included site grading, storm drainage system, and pre-engineered steel buildings designed and constructed to suit the customer's needs. Also, a foundry improvement which covered approximately 16000 s.f. for a flaskless mold line. This work consisted of the demolition and removal of existing floor and foundations; the addition of a two-story penthouse to accommodate a new silo system; and a new foundation and floor system including a shaker table pit and excess removal tunnel, embedded rails, a vibratory conveyor ramp and silo foundation. This project required heavily reinforced concrete structures with structural steel embedments.