Arrowhead Contracting, Inc.

Share

Lenexa, KS 66219

Company Info

  • Est. 1990
  • Size 100-249 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

At Arrowhead, we understand successful projects are not simply achieved, they are earned. From complex design-build structures and security systems, to remediation of the Nation’s most challenging Superfund Sites, Arrowhead has the people, systems, and determination to ensure your next project achieves tremendous success.

Arrowhead is defined by our people - honest, experienced, forward thinking, professional, and hard-working. Our project teams form collaborative relationships with clients, engineering partners, design teams, subcontractors, and others to assist in delivering the most desirable and economical solution to the construction goal, reinforcing the company’s reputation for superior workmanship and performance. Arrowhead’s business philosophy is dedicated to trusting relationships, excellent service, and workmanship that has enduring character and meets or exceeds customer expectations every time.

Arrowhead offers a diversi?ed professional and craft labor workforce and extensive experience utilizing direct hire practices and/or assenting to local labor agreements. The company maintains DCAA-Compliant accounting systems, providing the ability to perform ?rm-?xed price or cost- reimbursable Federal contracts. Arrowhead has the necessary resources to execute projects ranging from straightforward, short-duration engineering, and construction efforts to large, complex, multi-year ID/IQ programs to include facility demolition, new construction, and operation & maintenance. Our multidisciplinary staff includes engineers and construction professionals, supported by experts in industrial hygiene, construction safety, quality control, health physics and contract management.

What We Do

Regions & Counties Serviced

  • Missouri - Kansas City

Kansas All

Our CSI Codes

01 35 16 - Alteration Project Procedures
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 93 13 - Facility Maintenance Procedures
02 01 50 - Maintenance of Site Remediation
02 01 65 - Maintenance of Underground Storage Tank Removal
02 01 80 - Maintenance of Facility Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 06 50 - Schedules for Site Remediation
02 06 65 - Schedules for Underground Storage Tank Removal
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 26 36 - Hazardous Waste Drum Assessment
02 32 19 - Exploratory Excavations
02 50 00.00.01 - Site Remediation
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 55 00.00.01 - Remediation Soil Stabilization
02 56 13 - Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 58 16 - Snow Avalanche Control
02 60 00.00.01 - Contaminated Site Material Removal
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 86 00.00.01 - Hazardous Waste Drum Handling
04 01 20 - Maintenance of Unit Masonry
04 01 20.51 - Unit Masonry Maintenance
04 01 60 - Maintenance of Corrosion-Resistant Masonry
04 01 70 - Maintenance of Manufactured Masonry
04 05 16 - Masonry Grouting
04 06 20 - Schedules for Unit Masonry
04 06 20.13 - Masonry Unit Schedule
04 06 60 - Schedules for Corrosion-Resistant Masonry
04 57 00.00.01 - Masonry Fireplaces
11 92 23 - Agricultural Waste Clean-Up Equipment
12 11 23 - Brick Murals
23 01 60.71 - Refrigerant Recovery/Recycling
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 14 13.23 - Topsoil Stripping and Stockpiling
31 23 13 - Subgrade Preparation
31 30 00.00.01 - Earthwork Methods
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 50 - Operation and Maintenance of Fuel Distribution Lines
33 01 50.51 - Cleaning Fuel-Storage Tanks
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
35 49 13.16 - Masonry Floodwalls
35 73 13 - Earth Embankment Dam
41 01 40 - Operation and Maintenance of Container Processing and Packaging
41 01 60 - Operation and Maintenance of Mobile Plant Equipment
41 06 40 - Schedules for Container Processing and Packaging
41 06 50 - Schedules for Material Storage
41 06 60 - Schedules for Mobile Plant Equipment
41 08 10 - Commissioning of Bulk Material Processing Equipment
41 08 20 - Commissioning of Piece Material Handling Equipment
41 08 40 - Commissioning of Container Processing and Packaging
41 08 50 - Commissioning of Material Storage
41 08 60 - Commissioning of Mobile Plant Equipment
43 01 30 - Operation and Maintenance of Gas and Liquid Hi-Purification Equipment

Project Experience

  • Non-Union
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Service Work/Repairs
  • Projects From $2,000,000 and above

Diversity

  • Minority Business Enterprise

Gallery

Featured Image 1
USF&W Visitor’s Center
Featured Image 2
Zuni Hospital Renovation
Featured Image 3
Building 219 historic Renovation
Featured Image 4
Water Treatment Plant Optimization
Service Area and Locations Map for Arrowhead Contracting, Inc.
Share URL copied!
https://www.thebluebook.com/iProView/359826/arrowhead-contracting-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.