Logo

Tutor Perini Building Corp.

Share

Henderson, NV 89014

Company Info

  • Est. 1894
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Resorts World Casino New York City

Project Information

Project Location:
Jamaica, NY
Approx Contract:
$500,000,000
Status:
Completed - Jan 2011
Structure Type:
Casinos

References

Architect:
JCJ Architecture, Inc.
Client:
Genting New York, LLC

Scope Of Work

Resorts World New York City, the only casino in New York’s five boroughs, offers a unique gaming experience, combining automated table games such as Baccarat, Blackjack, Craps, slot machines, and Roulette with the added entertainment of the adjoining Aqueduct Raceway. The Racino was completed at a rapid pace to meet the requirements of the allotted eight-month construction schedule.

The scope of work included extensive sitework on 64 acres, as well as renovation and new construction totaling approximately 736,000 square feet occurring at the site of the existing Grandstand area. Located on the first floor of the gaming facility is the "Times Square Casino," a multi-level entertainment venue featuring the largest video screen of its kind in the nation and an outdoor terrace. "Fifth Avenue Casino" features high-stakes gaming and is located on the second floor with upscale dining and lounges. The third floor features "Central Park," a 70,000-square-foot event area with the main performance area/stage off the three-story grand atrium. The casinos have 5,000 video lottery terminals and electronic table games. Also included was the construction of a new five-level, 778,226-square-foot, 2,365-space parking garage with a bus drop-off area and lobby; and a 7,200-square-foot climate-controlled bridge to the nearby Metropolitan Transit Authority (MTA) station. Phase I included the casino ground floor that houses all of the support areas, main venue kitchen, dining areas, executive offices, employee dining, employee locker room, security, electrical rooms, mechanical spaces, life safety area, first floor casino and the parking garage. Phase Two included the second floor gaming area, two gourmet restaurants and the third floor multi-function space.

WDF’s Plumbing Division completed installation of all fixtures, roof drains, piping in all bathrooms, restaurants, and the casino floors. The HVAC department completed all the mechanical work for heating and cooling of the two casino floors, a convention space and the New York Racing Authority (NYRA) Operations Center, restaurants and the pedestrian bridge connecting the MTA train to Resorts World.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/356831/tutor-perini-building-corp/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.