Henry Ford Health Clinic
Project Information
- Project Location:
- Detroit, MI
- Status:
- Completed - May 2009
- Structure Type:
- School / College / University
References
- Owner:
- Detroit Public Schools
- Architect:
- General Contractor:
- Detroit Contracting, Inc.
Scope Of Work
Detroit Contracting Inc. (DCI) was the construction manager and the lead in the construction/design team which included Cash & Associates, Inc. (the designer). The project scope is as follows:
Henry Ford High School set aside approximately 3,000 square feet of space to be used by Henry Ford Health Systems (HFHS) for the purpose of a health clinic. The space is approximately 75’ x 40’ and contains two means of ingress/egress (one to an interior corridor and one to the building exterior). The space was sub-divided into the following uses:
|
|
All design and construction elements were to comply with DPS and the City of Detroit fire standards and applicable building codes. This was a fast track job that was designed and constructed in six weeks.