Hamilton County Jail
Project Information
- Project Location:
- Noblesville, IN
- Approx Contract:
- $20,000,000
- Status:
- Completed - Jan 2019
- Structure Type:
- Jail / Prison
References
- Architect:
- RQAW Corporation
Scope Of Work
Hamilton engaged The Hagerman Group for construction management services to build a new, 256-bed community corrections center and renovate the existing center to house 120 minimum security jail beds. The jail’s new, modular steel cells were fabricated off-site, weighing in at 17,000 pounds each and outfitted down to the beds, shower stalls, and fixtures. The prefabricated cells provided benefits of consistency and control over schedule and cost during construction.
Post-construction, the design of the jail allows Hamilton ’s maintenance staff to access the mechanical, electrical, and plumbing utilities from a corridor behind the cells.
Project Highlights
Constructed in an operating detention/correctional facility