Logo

J.E. Dunn Construction

Share

Denver, CO 80222

Company Info

  • Est. 1924
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Williston High School

Project Information

Project Location:
Williston, ND
Status:
Completed - Jun 2016
Structure Type:
Education (K-12)

References

Architect:
JLG Architects
Client:
Williston Public School District

Scope Of Work

JE Dunn completed a new high school in Williston, North Dakota June of 2017. The building is approximately 195,000 SF of classrooms, support spaces, and vocational spaces, with one auditorium and one gymnasium. Site infrastructure includes two main parking lots with access to drop-offs with approximately 900 parking spaces, a new track and football field, two practice fields and an approximately 200' diameter detention pond for storm water management.

A separate 20,000 SF career and technical education (CTE) building is also included, along with a full performing arts center and football stadium. The Career and Technical Education Building at the Williston High School included construction of a 20,800 SF building with four trade shops including Vo-Ag, building trades, automotive, and diesel mechanic shops. It also included four classrooms for meat lab, tech lab, health and science classrooms and a 900 SF greenhouse. The building was constructed from a pre-engineered metal building with brick and metal panel facades, interior masonry walls, sealed concrete floors and integrated MEP systems for each of the shops with dust collection systems, exhaust systems and compressed air for tools.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/354358/j-e-dunn-construction/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.