Logo

CCC Group, Inc.

Share

San Antonio, TX 78220

Company Info

  • Est. 1947
  • Size 500+ Employees
  • Annual Vol > $50 million

Featured Project Return to Projects List

New Wallboard Manufacturing Plant

Project Information

Project Location:
NC
Status:
Completed
Structure Type:
Manufacturing Plant

References

Client:
National Gypsum Company

Scope Of Work

National Gypsum Company constructed a new manufacturing plant that consists of the latest technology that produces gypsum wall board up to 600 lf per minute.

Construct the synthetic gypsum reclaim and conveyor handling system, as well as erect and install the process mill building for a new gypsum wallboard manufacturing plant.

Construction of an intricate, cast-in-place concrete truck dump hopper and reclaim tunnel (2,000 CYD of concrete)

Erection of a 30,000 sq. ft. pre-engineered building for waste board reclaim operations

Assembly and erection of approximately 1,200 lf of FGD material handling conveyors and affiliated transfer towers

Erection of 1,100 tons of structural steel for the process mill building

Assembly and installation of all the process equipment associated with the mill building, which included:

1,650 tons of material storage silos and feed bins

(7) pneumatic conveying transporters

1,000 lf of drag chain and screw conveyors

(3) process IMP mill systems, each with a with pre-heater, hammer mill, double cone classifier, cyclone collector and double duct collection system

(1) Flash Drying Cage mill system that includes drying column, cyclone collector, secondary dust collector, vent fan, and connective duct work

500 lf of large diameter exhaust ductwork

Project Images

#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/3373/ccc-group-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.