Griffith Co.
Santa Fe Springs, CA 90670
Featured Project Return to Projects List
Long Beach Airport
Project Information
- Project Location:
- Long Beach, CA
- Approx Contract:
- $25,500,000
- Status:
- Completed
- Structure Type:
- Airport Runway
References
- Owner:
- Architect:
- General Contractor:
- The Griffith Co.
Scope Of Work
Griffith Company continues to lay the groundwork for our air travels — even while the rest of us are fast asleep. Our construction crews worked deep into the night on an ambitious year long $25.5 million rehabilitation projection of the main runway of Long Beach Airport.
Each night when Long Beach Airport closed for transportation business, the Runway 12-30 renovation work day began. The complex task included paving, electrical work, grading, storm drain work and striping operations on the runway's vast, 10,200-foot-long by 200-foot-wide surface. By 6 a.m., the runway reopened and the Airport opened for business, without skipping a beat. Long Beach Airport's main runway has a colorful history, and served as the rollout site for the McDonnell Douglas DC-10 in August 1970. The runway was originally built in the 1950s and was most recently rehabilitated in 1978.