Featured Project Return to Projects List
Bear Island Paper Company
Project Information
- Project Location:
- Ashland, VA
- Status:
- Completed
- Structure Type:
- Industrial Maintenance
Scope Of Work
This project involves managing all aspects of the plant waste material and disposing of it in the on-site captive industrial landfill. The Shoosmith Construction crew collects the recycle line byproduct, coal/wood ash from the power generation boilers and places it in the landfill. At the landfill our team responsibly places the material in the landfill in such a manner to comply with all environmental regulations and maximize the life of the site. As a result of managing the facility by the Shoosmith way, the facility has realized over a 30% savings in airspace cost.