Logo

Masterlink Concrete Pumping

Burns Harbor, IN 46304

5.0

Company Info

  • Est. 2004
  • Size 5-9 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

I-94 Michigan City Bridge

Project Information

Project Location:
Michigan City, IN
Status:
Completed - Aug 2016
Structure Type:
Bridge

References

General Contractor:
JCI Bridge Group

Scope Of Work

Power lines directly overhead on this project stopped us from using our 52 Meter to hit the entire bridge.  We managed to stay the proper distance away from the power line by bring in our TB-110 conveyor on one side, and picked up the rest with our 38 meter.  Customer was very happy with the results.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/296252/masterlink-concrete-pumping/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.