Featured Project Return to Projects List
Adams Street Chicago 5.0
5.0
Project Information
- Project Location:
- Chicago, IL
- Status:
- Completed - Jun 2016
- Structure Type:
- Bridge
References
- Owner:
- Walsh Construction
- General Contractor:
- Thatcher Foundations Inc.
Scope Of Work
This was for the Chicago River modernization project. Old wood pilings along the river have been deteriorating and needed replacing. The purpose of these pilings is to protect the bridge from being hit by boat traffic. ML filled steel pilings with concrete to make the pilings even stronger than the design called for.