Featured Project Return to Projects List
DCT INDUSTRIAL CHRIN COMMERCE CENTER, LOT 30
Project Information
- Project Location:
- Palmer Township, PA
- Status:
- Completed - Nov 2015
- Structure Type:
- Manufacturing Plant
Scope Of Work
QEI Construction Group was hired by DCT Industrial as the General Contractor for their new warehouse facility on 35 acres in the Chrin Commerce Centre. The 426,000 SF industrial building is located at the corner of Van Buren and Hollow roads in Palmer
Township.
Construction of the warehouse included:
• Over 9,100 cubic yards of concrete for the 7” floor slab was poured in 11 nights
• Floor slab poured using a laser screed and exceeded flatness and levelness
tolerances of FF50 and FL35
• 172 tilt-up concrete panels
• 90 overhead loading doors
• Fully-adhered 60 Mil EDPM roofing system
• 79 stalls for trailer parking
• ESFR sprinkler system with a 2,000 GPM backup diesel pump
• A mechanical system capable of providing two air changes per hour
• State-of-the-art light fixtures throughout the facility
Construction was complete in 9 months, finishing in June 2015 with a final construction value of a little over $10 million. QEIC subsequently completed two tenant fit-outs for the building, totaling $2,775,000, which were completed in November 2015.
SQUARE FOOTAGE