Logo

ARGO Systems LLC

Share

Hanover, MD 21076

Company Info

  • Est. 2004
  • Size 100-249 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Ncts Naples Critical Power Assessment Building 440

Project Information

Project Location:
MD
Approx Contract:
$20,000,000
Status:
Completed
Structure Type:
Misc Project

References

Client:
NAVFAC EXWC

Scope Of Work

The focus of this report was to determine vulnerabilities of the facility as it pertains to the mission critical electrical power systems in the facility and the precision cooling system capacities that are located within each of the data processing spaces that support the mission. The electrical system is also being evaluated for the feasibility of creating a 100 % redundant electrical distribution system for mission critical loads at the server rack level by providing dual circuiting for mission critical data processing and telecommunication equipment. In order to accomplish this, equipment must be fed from two separate UPS sources. The equipment and systems being surveyed are the Uninterruptible Power Supplies (UPS), generators, electrical distribution equipment, precision cooling units, paralleling switch gear equipment, branch circuits, and equipment racks located in several spaces. The system will be evaluated on its present load configuration, possible future load configuration, age of equipment, single points of failure, and recommendation to improve reliability, redundancy and capacity.

Share URL copied!
https://www.thebluebook.com/iProView/292154/argo-systems-llc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.