M
MasTec Civil LLC
Medley, FL 33178
Featured Project Return to Projects List
SR-836 and 57th Ave Interchange
Project Information
- Project Location:
- Miami, FL
- Approx Contract:
- $3,000,000
- Status:
- Completed - Sep 2006
- Structure Type:
- Road / Highway
References
- Owner:
- MDX
Scope Of Work
Located on one the most traveled highways in Miami, FL, the project consisted of, but was not limited to, providing all labor, maintenance of traffic schemes, materials, equipment and incidentals necessary for the bridge widening and ramp improvements at the SR 836 and N.W. 57th Avenue Interchange. The work included clearing and grubbing, embankment, Type B stabilization, lime rock base, milling and resurfacing, asphalt pavement, drainage, gravity walls, bridge widening, guardrail, detector loop assemblies, lighting, signing and pavement markings.