Kelar Pacific has a dedicated staff of Architects, Engineers and Construction Professionals who
\r\nspecialize in:
\r\n
Architectural and Engineering Design Model Support
\r\n
• Preparing intelligent virtual 3D design models
\r\n
• Converting 2D drawings to 3D design models
\r\n
• Extracting project data to attain an exact virtual design and visual effect
\r\n
• Preparing conceptual energy analysis
\r\n
• Supporting the Project Team in design and construction documentation to shop drawings
\r\n(including LOD requirements); optimizing the process in all design and construction phases
\r\n
\r\n
Coordination Services
\r\n
• Create and oversee the process and the progress of the BIM execution and BIM requirements
\r\nin the project
\r\n
• Leading and supporting the team members in upholding BIM standards throughout a project’s lifecycle and optimizing the process
\r\n
• Establish and create standards in the BIM projects to help with the budget, scope, and schedule
\r\n
• Prepare and enforce the standards in BIM projects in the position of BIM coordinator, manage BIM models and data for coordination, establish coordination meeting and tasks for all disciplines involved with the project; report clashes, discrepancies and update the project models from design to construction and as build
\r\n
\r\n
MEP BIM Services
\r\n
• Manage the integration of mechanical electrical & plumbing (MEP) services into BIM
\r\n
• Prepare reports and construction documentation to reflect MEP integration
\r\n
• Extract the project information from the BIM model
\r\n
4-D (Scheduling, Phase Planning)
\r\n
Increasing the value of 3D models developed during the BIM enabled design process, 4D models in conjunction with a project’s scheduling system, link date driven construction activities and improve understanding and collaboration for all project participants.
\r\n
5-D (Quantity Take Off, Cost)
\r\n
Allowing for accurate quantity take-offs and assisting in the creation of cost estimates, 5-D models give estimators construction based quantities based on 3D geometry.
\r\n
\r\n
6-D (Facilities Management, Record Modeling, Maintenance Schedule)
\r\n
Linking the 3D model with all aspects of project life-cycle management, 6-D models are a deliverable to the owners when a project is closed out. This is commonly referred to as an “As Built” BIM model.
\r\n
\r\n
VDC and Implementation
\r\n
Using expert implementation practices and programs, Kelar Pacific has been recognized as experts in implementing BIM into businesses, streamlining VDC adoption and getting companies up to speed efficiently.
\r\n