Scope Of Work
In 2016, Locke Solutions chose Synchro to design and construct a state--the-art facility to manufacture precast concrete products.
Synchro provided support to the Owner in selecting an appropriate property that would not only support his unique facility requirements, but also the logistics trucking flow at the plant with easy access to major roadways. The quality the property had to be commensurate with the Owner’s vision for his building and business. Adequate acreage for a Phase 2 expansion was also a consideration. The property was eventually found in south Houston on Almeda Genoa road.
The manufacturing facility is a 50’ eave height superstructure to accommodate overhead crane hook height requirements. Two 50 ton and one 10 ton overhead crane bays run the full length the building. In addition, jib cranes are mounted off primary columns for localized fabrication needs. The silos and batch plant are under roof in the center bay. An underground tunnel runs along one side of the building to convey aggregate materials to the center bay batch plant.