Featured Project Return to Projects List
Harbor East Marina Design/Build for Marina Replacement & Dredging
Project Information
- Project Location:
- Baltimore, MD
- Approx Contract:
- $800,000
- Status:
- Completed
- Structure Type:
- Marine
References
- Owner:
- Harbor East Marina, LLC
- Architect:
- Moffat & Nichol Engineers
Scope Of Work
Replace the floating docks at the 175 slip Harbor East Marina with a new modern marina.The completed marina boasts 184 slips ranging in length from 30’ to 100’ with 40s and 50s being the most numerous. Larger boats can take advantage of 500 feet of alongside dockage. There are also several platforms incorporated into the floating docks for marina events and private gatherings, the largest of which is tented and features 1,600 SF of deck space. Large, 12” diameter x 60’ long and 18”x 60’ steel pipe piles hold the new docks firmly in place. In total, the Dissen & Juhn crew drove 120 piles totaling 7,215 feet.