Scope Of Work
Fidelity Power Systems furnished two Kohler Emergency Generators, Transfer Switches and Paralleling switchgear for the Perry Point Veterans Administration Medical Center in Perryville, Maryland. The generators are used as emergency back-up power for the 4,160 volt critical load central plant chillers.
Each Kohler Generator is two megawatts in capacity and both operate simultaneously through sophisticated synchronizing paralleling switchgear and have the ability to deliver a total power capacity of four megawatts. The Kohler generators are designed to provide full power within eight seconds of a power outage or interruption.
Fidelity Power Systems provides factory-authorized service and planned maintenance for this state-of-the-art project.
Credits
Distributor and Service Provider – Fidelity Power Systems
General Contractor – Pride Enterprises