DPR Construction

Share

Centennial, CO 80112

Company Info

  • Est. 1990
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Theragent-CDMO Facility

Project Information

Project Location:
Arcadia, CA
Status:
Completed
Structure Type:
Office Building

Scope Of Work

The Theragent project utilized an existing office and warehouse building to fit out a new contract development manufacturing organization (CDMO) facility, dedicated to manufacture cell and gene therapies for cancer patients around the world. The 26,000-sq.-ft. warehouse space was redesigned and constructed to include two unique manufacturing areas: GMP-certified modular cleanrooms and supporting lab space.

The construction of Theragent’s cleanrooms involved designing and installing an integrated cleanroom system, consisting of four pre-engineered, prefabricated modular “flex suites.” Each suite is equipped with 100% HEPA filtered air circulation units, integrated LED linear lighting, modular wall panels with uPVC finish, material and personnel airlocks, epoxy floors, and designated support space for disinfecting manufacturing products and purified water. All cleanrooms featured a walkable ceiling to help maintain the integrity of a cleanroom environment and to keep all mechanical and ventilation infrastructure accessible for inspection and maintenance.

The project included a 4-degree cold room, -80 degree and liquid nitrogen cryopreservation room, a gas utility room, a final release labeling room, and auxiliary storage space to store reagents, components, and kits. Three robust analytical labs for microbiological studies, quality control operations, and product development testing were also installed. The labs were designed to maximize natural light into the working environment and featured large exterior windows with floor-to-ceiling glass walls along the interior corridors.

The project also involved upgrading the exterior façade and site work for functionality and aesthetics to match the state-of-the-art ambience. Outside, in Theragent’s loading dock, notable additions to the exterior space include new boilers to support the mechanical systems, a standby generator, a liquid nitrogen tank, and storage facility for waste management. A new steel platform stands above the existing roof to support the new air handling units and equipment.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1734287/dpr-construction/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.