Logo

Rieth Riley

Indianapolis, IN 46206

Company Info

  • Est. 1916
  • Size 500+ Employees
  • Annual Vol > $50 million

Featured Project Return to Projects List

Tager Outlets

Project Information

Project Location:
Grand Rapids, MI
Status:
Completed
Structure Type:
Retail Store

References

Owner:
Tanger
General Contractor:
Rieth-Riley Construction Co., Inc.

Scope Of Work

Rieth-Riley Stabilized and replaced the parking lot at Tager Outlets in Grand Rapids with new pavement.

This job required removing existing asphalt to gravel base, stabilizing the existing gravel base using a cement stabilizing process that injects water & power cement into the grade-it then cures to provide a hard surface to pave on.

The new pavement is then placed in two lifts, a leveling and top course.  This process is a cost effective way the extend the life of parking lots with out having to do a full reconstruction with removing and replace the sub grade sand and gravel.  This also speeds up time of construction, as Rieth-Riley did numerous phases and were able to complete each in less than 2 weeks.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1701950/rieth-riley/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.