01 00 00 - General Requirements
01 45 00 - Quality Control
01 45 26 - Plant Inspection Procedures
01 71 00 - Examination and Preparation
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00 - Performance Requirements
01 80 00.00.01 - Performance Requirements
01 82 00 - Facility Substructure Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 00 - Facility Shell Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 00 - Interiors Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 00 - Facility Services Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 00 - Other Facility Construction Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 00 - Commissioning
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 00 00 - Existing Conditions
02 06 00 - Schedules for Existing Conditions
02 06 30 - Schedules for Subsurface Investigations
02 08 00 - Commissioning of Existing Conditions
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 00 - Existing Conditions Assessment
02 22 19 - Traffic Assessment
02 25 00 - Existing Material Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 00 - Geophysical Investigations
02 31 29 - Magnetotelluric Investigations
02 32 00 - Geotechnical Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 00 00 - Metals
05 08 00 - Commissioning of Metals
05 08 00.00.01 - Commissioning of Metals
06 00 00 - Wood, Plastics, & Composites
06 08 00 - Commissioning of Wood, Plastics, and Composites
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 00 00 - Specialties
10 08 00 - Commissioning of Specialties
10 08 00.00.01 - Commissioning of Specialties
11 00 00 - Equipment
11 08 00 - Commissioning of Equipment
11 08 00.00.01 - Commissioning of Equipment
11 22 00 - Refrigerated Display Equipment
11 22 00.00.01 - Refrigerated Display Equipment
11 47 00 - Ice Machines
11 47 00.00.01 - Ice Machines
13 00 00 - Special Construction
13 08 00 - Commissioning of Special Construction
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 00 00 - Fire Suppression
21 08 00 - Commissioning of Fire Suppression
21 08 00.00.01 - Commissioning of Fire Suppression
22 00 00 - Plumbing
22 08 00 - Commissioning of Plumbing
22 08 00.00.01 - Commissioning of Plumbing
23 00 00 - Heating, Ventilating, & Air Conditioning
23 01 00 - Operation and Maintenance of HVAC Systems
23 01 20 - Operation and Maintenance of HVAC Piping and Pumps
23 01 30 - Operation and Maintenance of HVAC Air Distribution
23 01 50 - Operation and Maintenance of Central Heating Equipment
23 01 60 - Operation and Maintenance of Central Cooling Equipment
23 01 70 - Operation and Maintenance of Central HVAC Equipment
23 01 80 - Operation and Maintenance of Decentralized HVAC Equipment
23 06 00 - Schedules for HVAC
23 06 20 - Schedules for HVAC Piping and Pumps
23 06 30 - Schedules for HVAC Air Distribution
23 06 30.16 - Air Terminal Unit Schedule
23 06 30.19 - Air Outlet and Inlet Schedule
23 06 50 - Schedules for Central Heating Equipment
23 06 50.13 - Heating Boiler Schedule
23 06 60 - Schedules for Central Cooling Equipment
23 06 60.13 - Refrigerant Condenser Schedule
23 06 60.16 - Packaged Water Chiller Schedule
23 06 70 - Schedules for Central HVAC Equipment
23 06 70.13 - Indoor, Central-Station Air-Handling Unit Schedule
23 06 70.16 - Packaged Outdoor HVAC Equipment Schedule
23 06 80 - Schedules for Decentralized HVAC Equipment
23 06 80.13 - Decentralized Unitary HVAC Equipment Schedule
23 06 80.16 - Convection Heating and Cooling Unit Schedule
23 08 00 - Commissioning of HVAC
23 08 00.00.01 - Commissioning of HVAC
23 20 00 - HVAC Piping and Pumps
23 20 00.00.01 - HVAC Piping and Pumps
23 23 00 - Refrigerant Piping
23 23 16 - Refrigerant Piping Specialties
23 23 19 - Refrigerant Safety Relief Valve Discharge Piping
23 23 23 - Refrigerants
23 24 00 - Internal-Combustion Engine Piping
23 24 13 - Internal-Combustion Engine Remote-Radiator Coolant Piping
23 30 00 - HVAC Air Distribution
23 30 00.00.01 - HVAC Air Distribution
23 60 00 - Central Cooling Equipment
23 60 00.00.01 - Central Cooling Equipment
23 61 00 - Refrigerant Compressors
23 61 23 - Rotary-Screw Refrigerant Compressors
23 62 00 - Packaged Compressor and Condenser Units
23 62 13 - Packaged Air-Cooled Refrigerant Compressor and Condenser Units
23 62 23 - Packaged Water-Cooled Refrigerant Compressor and Condenser Units
23 63 00 - Refrigerant Condensers
23 63 13 - Air-Cooled Refrigerant Condensers
23 63 23 - Water-Cooled Refrigerant Condensers
23 63 33 - Evaporative Refrigerant Condensers
23 64 00 - Packaged Water Chillers
23 64 13 - Absorption Water Chillers
23 64 13.13 - Direct-Fired Absorption Water Chillers
23 64 13.16 - Indirect-Fired Absorption Water Chillers
23 64 16 - Centrifugal Water Chillers
23 64 19 - Reciprocating Water Chillers
23 64 23 - Scroll Water Chillers
23 65 00 - Cooling Towers
23 65 33 - Liquid Coolers
23 71 00 - Thermal Storage
23 71 13 - Thermal Heat Storage
23 71 13.13 - Room Storage Heaters for Thermal Storage
23 71 13.23 - Pressurized-Water Thermal Storage Tanks
23 71 16 - Chilled-Water Thermal Storage
23 71 19 - Ice Storage
23 71 19.13 - Internal Ice-on-Coil Thermal Storage
23 71 19.16 - External Ice-on-Coil Thermal Storage
23 71 19.19 - Encapsulated-Ice Thermal Storage
23 71 19.23 - Ice-Harvesting Thermal Storage
23 71 19.26 - Ice-Slurry Thermal Storage
25 00 00 - Integrated Automation
25 08 00 - Commissioning of Integrated Automation
25 08 00.00.01 - Commissioning of Integrated Automation
25 50 00 - Integrated Automation Facility Controls
25 50 00.00.01 - Integrated Automation Facility Controls
26 00 00 - Electrical
26 05 00 - Common Work Results for Electrical
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00 - Commissioning of Electrical Systems
26 08 00.00.01 - Commissioning of Electrical Systems
26 27 00 - Low-Voltage Distribution Equipment
26 27 13 - Electricity Metering
27 00 00 - Communications
27 08 00 - Commissioning of Communications
27 08 00.00.01 - Commissioning of Communications
28 00 00 - Electronic Safety & Security
28 08 00 - Commissioning of Electronic Safety and Security
28 08 00.00.01 - Commissioning of Electronic Safety and Security
28 35 00 - Refrigerant Detection and Alarm
28 35 13 - Refrigerant Detection and Alarm Control, GUI, and Logic Systems
28 35 23 - Refrigerant Detection and Alarm Integrated Audio Evacuation Systems
28 35 33 - Refrigerant Detection Sensors
31 00 00 - Earthwork
31 08 00 - Commissioning of Earthwork
31 08 00.00.01 - Commissioning of Earthwork
31 09 00 - Geotechnical Instrumentation and Monitoring of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
32 00 00 - Exterior Improvements
32 08 00 - Commissioning of Exterior Improvements
32 08 00.00.01 - Commissioning of Exterior Improvements
33 00 00 - Utilities
33 08 00 - Commissioning of Utilities
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 12 00 - Water Utility Distribution Equipment
33 12 33 - Water Utility Metering
33 51 00 - Natural-Gas Distribution
33 51 33 - Natural-Gas Metering
33 61 00 - Hydronic Energy Distribution
33 61 33 - Hydronic Energy Distribution Metering
33 63 00 - Steam Energy Distribution
33 63 33 - Steam Energy Distribution Metering
33 71 00 - Electrical Utility Transmission and Distribution
33 71 73 - Electrical Utility Services
33 71 73.33 - Electric Meters
34 00 00 - Transportation
34 08 00 - Commissioning of Transportation
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
35 00 00 - Waterway & Marine Construction
35 08 00 - Commissioning of Waterway and Marine Construction
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 00 00 - Process Integration
40 80 00 - Commissioning of Process Systems
40 80 00.00.01 - Commissioning of Process Systems
41 00 00 - Material Processing & Handling Equipment
41 08 00 - Commissioning of Material Processing and Handling Equipment
41 08 30 - Commissioning of Manufacturing Equipment
42 00 00 - Process Heating, Cooling, & Drying Equipment
42 08 00 - Commissioning of Process Heating, Cooling, and Drying Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
42 22 00 - Process Chillers and Coolers
42 22 13 - Centrifugal Process Chillers and Coolers
42 22 16 - Reciprocating Process Chillers and Coolers
42 22 19 - Refrigerant Process Chillers and Coolers
42 22 23 - Rotary Process Chillers and Coolers
42 22 26 - Thermoelectric Process Chillers and Coolers
43 00 00 - Process Gas & Liquid Handling, Purification....
43 08 00 - Commissioning of Process Gas and Liquid Handling, Purification, and Storage Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 00 00 - Pollution Control Equipment
44 08 00 - Commissioning of Pollution Control Equipment
44 08 40 - Commissioning Water Treatment Equipment
45 00 00 - Industry-Specific Manufacturing Equipment
45 08 00 - Commissioning of Industry-Specific Manufacturing Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 00 00 - Electrical Power Generation
48 08 00 - Commissioning of Electrical Power Generation
48 08 00.00.01 - Commissioning of Electrical Power Generation