Texas Parks & Wildlife Lake Somerville State Park Birch Creek Waste Water Treatment Facility Upgrades
Project Information
- Project Location:
- TX
- Approx Contract:
- $1,000,000
- Status:
- Completed
- Structure Type:
- Park / Playground
Scope Of Work
This $2.1M project is located on 25 acres within a State Park consisting of new water treatment system with a natural lagoon treatment. Project consists of constructing a Facultative Lagoon, two (2) stabilization ponds, and one (1) irrigation pond with amended soil liners with permanent erosion control measures. This project includes tie-ins to existing force mains routed to the new natural lagoon treatment system, new irrigation fields, and multiple man holes, T-Valve Manholes, and a large irrigation and recirculation pump station for proper treatment, and security fencing around the plant. Scope of work included demolition and removal of existing 40 year old package treatment plant with removal of existing sediment lagoons, including necessary soil abatement measures. New treatment system includes new 3-phase power to the site with related power equipment and controls for a fully operational water treatment system. G2 is currently replacing internal components within nine of the eleven existing pump stations throughout the park with new pump control modules to feed the treatment plant. Jamison currently acts as the Project Manager on the project.