Lightner Creek Bridge
Project Information
- Project Location:
- Durango, CO
- Approx Contract:
- $250,000
- Status:
- Completed
- Structure Type:
- Bridge
Scope Of Work
$240,000 CM/GC delivery where G2 Contractors took the lead to hire a structural engineer, civil engineer, and bridge engineer. G2 was contracted directly to perform pre-construction services for all aspects of the project, including coordination with the Army Corp of Engineers and La Plata County Floodplain requirements. Project consists of 300 linear feet of drive on steep slopes in conjunction with a 38’ x 12’ pre-engineered Steadfast Vehicular bridge by Contech Engineered Solutions with a concrete deck and guardrails. Upon negotiation of pricing, G2 Contractors entered into a lump sum agreement to construct the bridge, drive, retaining walls, and abutments. G2 was hired due to its experience with difficult projects with this specific project having a high degree of difficulty due to steep mountainous terrain involving a drainage area and limited accessibility. Jamison is currently acting as both Project Manager and Superintendent on this project due to its level of difficulty.