G2 Contractors LLC

Share

Austin, TX 78741

Company Info

  • Est. 2009
  • Size 5-9 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Lightner Creek Bridge

Project Information

Project Location:
Durango, CO
Approx Contract:
$250,000
Status:
Completed
Structure Type:
Bridge

Scope Of Work

$240,000 CM/GC delivery where G2 Contractors took the lead to hire a structural engineer, civil engineer, and bridge engineer. G2 was contracted directly to perform pre-construction services for all aspects of the project, including coordination with the Army Corp of Engineers and La Plata County Floodplain requirements. Project consists of 300 linear feet of drive on steep slopes in conjunction with a 38’ x 12’ pre-engineered Steadfast Vehicular bridge by Contech Engineered Solutions with a concrete deck and guardrails.  Upon negotiation of pricing, G2 Contractors entered into a lump sum agreement to construct the bridge, drive, retaining walls, and abutments. G2 was hired due to its experience with difficult projects with this specific project having a high degree of difficulty due to steep mountainous terrain involving a drainage area and limited accessibility. Jamison is currently acting as both Project Manager and Superintendent on this project due to its level of difficulty.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1643240/g2-contractors-llc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.