Logo

Dolan Construction & Design, Inc.

Nicasio, CA 94946

Company Info

  • Est. 1995
  • Size 1-4 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Dolan Construction and Design (DCD) is a family owned and operated company based in Marin County, California.   Established in 1995, DCD offers a variety of general contracting services with extensive expertise and experience in seismic and structural upgrading for private and commercial projects.  We have over 25 years experience with local architects, engineers, building departments and property owners.   We provide efficient and thorough service to our valued clients.  Owner, Aodh Dolan, has a personal overview of each project through its completion.  

What We Do

Commercial Experience

Misc Project

Regions & Counties Serviced

  • San Francisco, Oakland, San Jose

California 1

  • Marin

Our CSI Codes

01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 94 13 - Facility Decommissioning Procedures
02 32 19 - Exploratory Excavations
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 58 16 - Snow Avalanche Control
03 01 70 - Maintenance of Mass Concrete
03 06 70 - Schedules for Mass Concrete
03 70 00.00.01 - Mass Concrete
03 71 00.00.01 - Mass Concrete for Raft Foundations
03 72 00.00.01 - Mass Concrete for Dams
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 14 13.23 - Topsoil Stripping and Stockpiling
31 23 13 - Subgrade Preparation
31 30 00.00.01 - Earthwork Methods
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
35 73 13 - Earth Embankment Dam

Gallery

Featured Image 1
Services
Featured Image 2
Services
Featured Image 3
Services
Featured Image 4
Services
Share URL copied!
https://www.thebluebook.com/iProView/1628403/dolan-construction-design-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.