Wallitsch Garden Center

Share

Tampa, FL 33634

Company Info

  • Est. 1898
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Rancho Penasquitos Pressure Control Hydro-Electric

Project Information

Project Location:
Escondido, CA
Approx Contract:
$80,000,000
Status:
Completed
Structure Type:
Renewable Energy

References

Owner:
San Diego County Water Authority
Architect:
Black & Veatch

Scope Of Work

This hydroelectric facility project includes approximately 2,900 linear feet of 96-inch CML&D pipe; connections to an existing WSP; cathodic protection; a reinforced concrete  masonry building housing three 42-inch-diameter control valves; a 4.5 MW hydroelectric generating system; a medium-voltage power system; a facility control  communication system; an HVAC system; buried reinforced concrete vaults housing three 84-inch-diameter butterfly valves  an ultrasonic flow meter; street paving, drainage  utility improvements; revegetation  landscaping; and fencing and traffic control.

Share URL copied!
https://www.thebluebook.com/iProView/1627362/wallitsch-garden-center/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.