Venetian Causeway Bridge Rehabilitation No. 874459
Project Information
- Project Location:
- Miami, FL
- Status:
- Completed - Jan 2016
- Structure Type:
- Bridge
References
- Client:
- Miami-Dade County
Scope Of Work
Venetian Causeway Bridge Rehabilitation No. 874459
Client: Miami-Dade County
Location: Miami, Florida
Construction: 2015 – 2016
The work included all design and construction services necessary to rehabilitate the westernmost portion of Bridge No. 874459/Venetian Causeway (Bridge) in Miami-Dade County by removing and disposing, in an artificial reef, approximately 730’-9” of the bridge’s westernmost superstructure and substructure including the first abutment, existing bulkhead, and the expansion joint at the end of the cantilevered beams, and replacing with a new complete bridge superstructure, substructure, approach roadway, and lighting meeting the requirements of the contract documents.
MAJOR QUANTITIES:
3,325 CY of Structural Concrete
2,920 LF of Precast Arch Concrete Beams
1,600 LF of 54” Diameter Drilled Shafts
80 LF Sheetpile Bulkhead Wall
Electrical, Street Lighting