Logo

GLF Construction Corp.

Share

Miami, FL 33131

Company Info

  • Est. 1993
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

SR-453 (Wekiva Parkway) from System Interchange to SR-46 # 429-206

Project Information

Project Location:
Lake County, FL
Status:
Completed
Structure Type:
Road / Highway

Scope Of Work

Project consisted of 1.68 miles of divided highway with 6 bridges. Two bridges call for 18” concrete pile, and four bridges are designed for HP 14×89 steel pile. Two bridges have Florida U Beams, two have rectangular concrete pre-stressed beams, and two have structural steel girders. The project also involves the installation of toll facilities, along with the clearing, earthwork, ponds, storm drainage, barrier walls, overhead signs, and pavement in accordance with the contract documents. Location: Lake County, FL

Share URL copied!
https://www.thebluebook.com/iProView/1590960/glf-construction-corp/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.