Little Rock Air Force Base
Project Information
- Project Location:
- AR
- Approx Contract:
- $150,000
- Status:
- Completed - Nov 2016
- Structure Type:
- Airport Runway
Scope Of Work
This was a design/build project which required CNC to replace the existing membrane roof on the Control Tower with a polyvinyl-Chloride roof. CNC removed the existing roofing materials, prepped the roof, and replaced the roof based on Government requirements. CNC also installed a complete lightning system which included air terminal devices, interconnecting conductors, down conductors, ground rods, and buried ground grid. Incidental work included cleaning and repainting mechanical fan coil units.