Charlotte Country Day Lower School Walkway
Project Information
- Project Location:
- Charlotte, NC
- Status:
- Completed - Aug 2018
- Structure Type:
- Education (K-12)
References
- Owner:
- Charlotte Country Day School
Scope Of Work
- The project was for the refurbishment of an outdoor walkway that had been deteriorating over the years due to the exposure of sodium chloride during winter months. The sodium chloride had eaten thru the previous coating along with weakening the concrete on walkway.
- The challenges for the project were working outside(weather), tight working area, repairing damaged concrete and short notice deadline.
- Composites Work proposed a 1/4 inch sand trowel underlayment to go over damaged walkway to create a solid surface for the double quartz broadcast system.