Cianbro Corp.

Share

Lexington, SC 29072

Company Info

  • Est. 1949
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Alfond W² Ocean Engineering Lab

Project Information

Project Location:
Orono, ME
Status:
Completed - Jan 2015
Structure Type:
Laboratory

Scope Of Work

Scope of Work

Cianbro served as Construction Manager for a new 12,750-square-foot addition to the existing Offshore Wind Laboratory, comprising a 9,000-square-foot wave tank and 3,750 square feet for robotics. The addition is approximately 45 feet high to accommodate the Tunnel Positioning System, which is similar in height to an overhead bridge crane.

Project Details

Managed sitework, including mass excavation and backfill for the wave basin; new underground electrical power feed; and water, sewer, and storm drain systems

Constructed wave basin using shotcrete

Cast-in-place foundations

Fabricated and erected the structural steel superstructure

Installed metal insulated wall panels

Ethylene propylene diene monomer (EPDM) roofing

Installed complete heating and air conditioning systems

Installed electrical lighting and power controls

Lean, Innovative and Unique Project Solutions

The nine-month accelerated construction schedule occurred in tandem with daily college classes. Precise coordination with The University of Maine, as well as on-site team members and trade partners, was critical to eliminating any impact on the students and faculty as a result of project operations.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1557980/cianbro-corp/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.