JM Mechanical LLC
Lemoyne, PA 17043
Featured Project Return to Projects List
Telecommunications Building
Project Information
- Project Location:
- Carlisle, PA
- Status:
- Completed - Jul 2018
- Structure Type:
- Utilities
References
- Architect:
- CEC Group LLC
- General Contractor:
- CEC Group LLC
Scope Of Work
Installation of two 7 1/2T AC units to condition the battery room for consistent ambient read temp of 70 degrees or lower. Design challenges included placing 2 - 7 1/2T air handlers in same location replacing 1 - 15T air handler. Integrated the BAS system to control both units as one primary and one fail over. Client/Customer was pleased with finished product and happy with results recieved.