01 24 13 - Value Engineering
01 29 83 - Payment Procedures for Testing Laboratory Services
01 31 13 - Project Coordination
01 31 19.13 - Preconstruction Meetings
01 35 16 - Alteration Project Procedures
01 84 19 - Interior Finishes Performance Requirements
01 85 00.00.01 - Conveying Equipment Performance Requirements
01 87 13 - Equipment Performance Requirements
01 88 16 - Selective Construction Performance Requirements
01 91 23 - Interiors Commissioning
01 91 23.13 - Interior Construction Commissioning
01 91 23.43 - Stairways Commissioning
03 08 00.00.01 - Commissioning of Concrete
04 08 00.00.01 - Commissioning of Masonry
05 01 40 - Maintenance of Cold-Formed Metal Framing
05 06 40 - Schedules for Cold-Formed Metal Framing
05 10 00.00.01 - Structural Metal Framing
05 12 13 - Architecturally-Exposed Structural Steel Framing
05 13 00.00.01 - Structural Stainless-Steel Framing
05 14 13 - Architecturally-Exposed Structural Aluminum Framing
05 40 00.00.01 - Cold-Formed Metal Framing
05 41 00.00.01 - Structural Metal Stud Framing
05 43 00.00.01 - Slotted Channel Framing
05 45 13 - Mechanical Metal Supports
05 45 23 - Healthcare Metal Supports
06 01 10 - Maintenance of Rough Carpentry
06 01 10.71 - Rough Carpentry Rehabilitation
06 01 10.91 - Rough Carpentry Restoration
06 01 10.92 - Rough Carpentry Preservation
06 01 20.71 - Finish Carpentry Rehabilitation
06 06 10 - Schedules for Rough Carpentry
06 06 10.13 - Nailing Schedule
06 06 10.19 - Plywood Shear Wall Schedule
06 10 53 - Miscellaneous Rough Carpentry
06 10 91 - Curved Wood Members
06 13 13 - Log Construction
06 13 13.91 - Period Horizontal Log Work
06 13 16 - Pole Construction
06 13 23 - Heavy Timber Construction
06 14 00.00.01 - Treated Wood Foundations
06 20 13 - Exterior Finish Carpentry
06 40 13 - Exterior Architectural Woodwork
06 41 13 - Wood-Veneer-Faced Architectural Cabinets
06 43 16 - Wood Railings
06 44 13 - Wood Turnings
06 44 19 - Wood Grilles
06 44 23 - Wood Corbels
06 44 29 - Wood Finials
06 44 33 - Wood Mantels
06 44 36 - Wood Pediment Heads
06 46 13 - Wood Door and Window Casings
06 46 16 - Wood Aprons
06 46 19 - Wood Base and Shoe Moldings
06 46 26 - Wood Cornices
06 46 33 - Wood Stops, Stools, and Sills
06 46 91 - Splicing of Wooden Components
06 48 19 - Ornamental Wood Frames
06 48 26 - Wood-Veneer Frames
07 01 30 - Maintenance of Steep Slope Roofing
07 01 50 - Maintenance of Membrane Roofing
07 01 50.23 - Roof Removal
07 01 50.61 - Roof Re-Coating
07 01 50.81 - Roof Replacement
07 01 50.91 - Roofing Restoration
07 06 30 - Schedules for Steep Slope Roofing
07 06 50 - Schedules for Membrane Roofing
07 57 13 - Sprayed Polyurethane Foam Roofing
08 01 10 - Operation and Maintenance of Doors and Frames
08 06 10 - Door Schedule
09 01 20 - Maintenance of Plaster and Gypsum Board
09 01 30 - Maintenance of Tiling
09 06 30 - Schedules for Tiling
09 06 20 - Schedules for Plaster and Gypsum Board
09 22 16 - Non-Structural Metal Framing
09 22 16.13 - Non-Structural Metal Stud Framing
09 30 13 - Ceramic Tiling
09 62 23 - Bamboo Flooring
09 64 19 - Wood Composition Flooring
09 64 23 - Wood Parquet Flooring
09 64 23.13 - Acrylic-Impregnated Wood Parquet Flooring
09 64 29 - Wood Strip and Plank Flooring
09 64 33 - Laminated Wood Flooring
09 64 53 - Resilient Wood Flooring Assemblies
12 06 30.13 - Manufactured Casework Schedule
12 11 26 - Ceramic Tile Murals
12 58 83 - Custom Residential Furniture