JMG Constructors LLC
Keyport, WA 98345
Featured Project Return to Projects List
MANCHESTER STATE PARK FISH PASSAGE BARRIER CORRECTION
Project Information
- Project Location:
- Port Orchard, WA
- Status:
- Completed
- Structure Type:
- Misc Project
Scope Of Work
Key Personnel
Jeff Granlee, Senior Project Manager
Ron Ellingford, General Superintendent
JMG Constructors, LLC
May 2015 – January 2016
Project Description
This project is for the replacement two culverts that are currently barriers to fish passage and restore fish passage through the park property. One existing culvert is 18” CMP and the other is 3’ HDPE and both are replaced with split box culvert sections with wing walls. The new crossing are designed using stream simulation methods. Additional work includes the rerouting and restoration of domestic water line to park shop building and irrigation line and sprinkler head to entrance island, bringing primary power to the park shop area and underground secondary power to the entrance island for sewer lift station and sign flood light, relocation of “winter water” hose bib with frost proof valve, replacement of gravity sewer manhole with simplex pump lift station including all plumbing, electrical supply and control panel, preparation of finish subgrade for HMA paving for the relocated return to park route, placement of continuous cement concrete curbing, replacing top soil and lawn sod, fabricating and installing a new park entrance sign, landscaping plantings, and installation of new HMA Class ½” overlay to existing park entrance road, exit road, contact station area and parking area.